Experience

Some of our supervision and control projects:

SUPERVISION AND CONTROL OF IMPROVEMENT WORKS IN SAN CRISTOBAL NEIGHBORHOOD

Supervision and control of road network improvement works in San Cristobal, Bogotá.

 

Contracting party: San Cristobal local development fund

Start date: March 2021

Completion date: January 2022

SUPERVISION AND CONTROL OF ROAD MESH IMPROVEMENT WORKS SITP ROUTES

Supervision and control of road network improvement works - SITP routes​.

Contracting party: IDU

Start date: January 2021

Completion date: December 2021

SUPERVISION AND CONTROL CONCEPCION-SAN VICENTE ROAD

Concepción-san vicente highway paving supervision and control.

Contracting party: Antioquia Government

Start date: August 2019

Completion date: July 2020

SUPERVISION AND CONTROL MINCA-CAMPANO-LA TAGUA ROAD

Supervision and control for maintenance, improvement, and conservation in the Minca-Campano-La Tagua road (perforated road plates) in Santa marta.

Length: 8.1 km

Date: 2014 to 2016

SUPERVISION AND CONTROL  LA PINTADA-BOLOMBOLO ROAD

Supervision and control for the improvement and maintenance of La Pintada roads-Bolombolo Cod 25B01, Bolombolo- Santafé Antioquia Cod 25B02, Santafé de Antioquia-Turbo, in Antioquia.

Date: 2011 to 2012

 

SUPERVISION AND CONTROL AVENIDA 68-CALLE 100

Supervision and control for the rehabilitation and maintenance works on Avenida 68-Calle 100, in Bogotá.

Number of lanes: 4

Road length: 17.6 km

 

Date: 1999 to 2001

ROAD MESH OF THE META

Technical and financial supervision and control in the construction and operation stages of the Villavicencio-Granada, Villavicencio-Puerto López, and Villavicencio-Restrepo-Cumaral Highway concession.  (Includes the supervision of the construction of the vehicular bridge over the Guatiquía River, with a length of 420 meters and the bridge over the Guayuriba River with a length of 235 meters.)

Length: 178.0 km

Date: 1995 to 1998

 

GAMBOTE BRIDGE

Technical and administrative supervision and control for the study, construction and design of emergency works. Rehabilitation of the Gambote bridge, in Bolivar.​

Date: 1994 to 1996

 

Supervision of toll collection concession contract: 

TOLL COLLECTION CONCESSION

Operational, administrative and systems supervision and control for toll collection concession contracts.

Date: 2003 to 2004

Some of our road studies and designs projects:

SUPERVISION AND CONTROL STUDIES AND DESIGNS  AIRPORT RUNWAYS

Supervision and control of studies and designs for improvement of airport runways - group 2.

Contractor: Consorcio Terra Projekta

Contracting party: Aeronáutica Civil

Start date: January 2021

Completion date: October 2021

ROAD CONNECTIVITY STUDIES IN LA GUAJIRA

Road connectivity studies in La Guajira.


Contractor: Consorcio Terra Guajira

Contracting party: INVIAS


Start date: January 2021

Start date: October 2021

STUDIES AND DESIGNS FOR IMPROVEMENT AND PAVEMENT OF ROADS IN THE CATATUMBO REGION

Studies and designs for road improvement and paving in the Catatumbo region.

Contractor: Consorcio Incoplan Terra

Contracting party: INVIAS

Start date: January 2021

Completion date: June 2022

STUDIES AND DESIGNS FOR IMPROVEMENT OF ROADS AND PUBLIC SPACE IN PUENTE ARANDA

Studies and designs to improve roads and public spaces in Puente Aranda,Bogotá - group 2.

Contractor: Consorcio Intersa Terra

Contracting party: IDU

Start date: January 2021

Completion date: March 2022

 

MAGANGUE VARIANT

Studies and designs, Magangué Variant.

Contractor: INVIAS

Start date: September 2019

Completion date: June 2020

SUBA AVENUE

Studies and Designs for the adaptation to the TRANSMILENIO system of Avenida Suba, from Avenida Ciudad de Cali to Avenida Ciudad de Medellín.

Date: 2002 to 2003

 

VIA ASTILLEROS - TIBÚ - LA GABARRA

Studies for the improvement and paving of the Astilleros Tibú La Gabarra highway, in Norte de Santander.

Number of lanes: 1

Length: 150 km

Date: 1997 to 1998

NQS AVENUE

Studies and designs for the adaptation to the TRANSMILENIO system of Avenida Norte Quito Sur, from Avenida Paseo Los Libertadores to the Soacha District boundary, in Bogotá.

Corridor length: 19.6 km

Number of Transmilenio stations: 21

Number of pedestrian bridges: 49

Number of vehicular bridges: 17

La Hoja articulated bus parking lot: Area=13,440 m2

General Santander Police School Integration Station: Area = 6,600 m2

Portal Head and Patio: Area = 85,000 m2

Date: 2002 to 2003

Some of our building construction supervisions

IMPROVEMENTS OF EDUCATIONAL INSTITUTIONS

Supervision and control for the improvement of educational institutions. Group 4 Antioquia.

Contractor: Consorcio Terra Donovan

Contracting party: Fondo de Financiamiento de la Infraestructura Educativa (FFIE)

Start date: May 2020

Completion date: July 2021

IMPROVEMENTS OF EDUCATIONAL INSTITUTIONS

Supervision and control for the improvement of educational institutions. Group 5 Antioquia.

Contractor: Consorcio Terra Donovan

Contracting party: Fondo de Financiamiento de la Infraestructura Educativa (FFIE)

Start date: May 2020

Completion date: July 2021

IMPROVEMENTS OF EDUCATIONAL INSTITUTIONS

Supervision and control for the improvement of educational institutions. Group 7 Antioquia.

Contractor: Consorcio Terra Donovan

Contracting party: Fondo de Financiamiento de la Infraestructura Educativa (FFIE)

Start date: May 2020

Completion date: July 2021

IMPROVEMENTS OF EDUCATIONAL INSTITUTIONS

Supervision and control for the improvement of educational institutions. Group 9 Antioquia.

Contractor: Consorcio Terra Donovan

Contracting party: Fondo de Financiamiento de la Infraestructura Educativa (FFIE)

Start date: May 2020

Completion date: July 2021

HOTEL FARANDA, BARRANQUILLA

Supervision and control of the construction of the Faranda Hotel, Barranquilla.

 

11 floors + basement

Built area: 5,137 m2

Contractor: BOHM & MATE

Date: 2017-2018

ADARVES DE SALITRE

Construction supervision and control of Adarves de Salitre urbanization, in Bogotá.

Area: 32,852 m2

Date: 1992 to 1993

 

NUEVA TIBABUYES

Construction supervision and control of Nueva Tibabuyes housing complex, in Bogotá.

Area: 4,826 m2

Date: 1991 to 1992

TONOLI II AND III

Technical and administrative audit of building and urban planning works of the Tonolí projectsII A, TonolíII B, TonolíIII and TonolíIII A, in Bogotá.

Area: 36,269 m2

Date: 1988 to 1989

 

SUBA TELEPHONE EXCHANGE (ETB)

Technical and administrative supervision and control for the construction of the Suba telephone exchange, in Bogotá.

Area 1,900 m2

Date: 1979 to 1980

 

CARLOS LLERAS RESTREPO URBANIZATION

Construction supervision and control of block D of the second stage of the Carlos Lleras Restrepo urbanization, in Bogotá.

Area: 34,466 m2

 

Date: 1994 to 1995

URBANISM WORKS CIUDAD SALITRE

Supervision and control for the construction of roads and public service networks in Ciudad Salitre, sector 6, in Bogotá.

Date: 1988 to 1989

Some of our studies and designs of buildings: 

GENERAL LIBRARY JAVERIANA UNIVERSITY

Structural design and supervision/control for the construction of the general library.

 

Area: 8,900 m2

Date: 1975

 

PEDESTRIAN BRIDGE JAVERIANA UNIVERSITY

Structural design pedestrian bridge and related works.

Area :1,800 m2

Date: 1977

 

PASTORAL CHAPEL JAVERIANA UNIVERSITY

Structural design of the Javeriana University pastoral chapel.

 

Area: 786 m2

Date: Year 1980

CENTRAL MORTGAGE BANK

Structural design of the BCH headquarters building in Neiva.

 

Area: 4,233 m2

Date:  1979-1980

HELIÓPOLIS RESIDENTIAL COMPLEX

Structural design of the heliopolis residential complex.

 

Area: 16,900 m2

Date: 1979-1980

 